21 Moorfields

Deutsche Bank

£50M+

Apr 2022

Preparing to serve as the new UK HQ for Deutsche Bank, 21 Moorfields is currently under construction, with handover due in 2023. Fit-out of the building will follow with Deutsche Bank taking a phased occupation of the building on a floor by floor basis through 2024-25.

Affinity produced a responsibility matrix in respect of the fire safety responsibility requirements within CDM and HSG 168. Further we are providing construction phasing support in regards to the phased occupation, and will continue to provide construction support.

Next case study

Tolworth Hospital

Sir Robert McAlpine

£50M+

Dec 2024

The development is located on the current Tolworth Hospital site in Surbiton, Kingston upon Thames, London. It involves the demolition of existing buildings and the erection of a new hospital building with improved entrance and landscaping characteristics. The hospital is to contain up to seven new mental health wards on two floors.​

Affinity have been appointed to develop the Fire Strategy in support of the design developed by Ryder Architecture and approvals process for the scheme, so as to provide strategic design and performance criteria which, when met by the design of the building, are designed to enable all stakeholder requirements to be met.